0
comments
Members of the Baker Electric Solar team worked closely with Del Cerro Baptist’s staff and facilities manager to design a solution that would best meet the church’s financial and environmental goals.
Baker designed and installed 3,142 LG solar panels and 38 SMA inverters using a carport configuration. The Baker solar system was built to complement the high school’s building colors and façade.
Meziere Enterprises based in Escondido since the early 1970s, is no stranger to the cost of powering a manufacturing business in San Diego. Mezeire knew switching to solar was the optimal solution for getting ahead of continually escalating electric rates.
Baker specializes in precision-designed solar and installed the optimal system to meet Vanguard’s energy, environmental and cost-cutting objectives.