This 2,000+ seat headliner theater is accessible via the casino and includes multi-level seating areas, VIP box suites and lounges, multiple bars and state-of-the-art sound and lighting. Additionally, the project incorporated the construction of a 10,000 SF warehouse to support hotel and casino operations, linked to the hotel via a 500-foot-long underground tunnel.
This LEED Certified project is a 14-story, 568 room expansion to the existing hotel. This project also includes a stand-alone luxury 2-story spa, fitness center and hydrotherapy pool terrace, a pool complex with 8 pool areas, two new restuarants, a 67,000 SF ballroom and an outdoor amphitheater.
This project was a 45,000 SF office and data center for the San Diego County Sheriff’s Department. The STIC facility will provide new wireless communications for the various Sheriff's divisions
The 73,000 SF facility serves as an activity hub that provides amenities for the everyday life of students and faculty. Common goals throughout the project included interactive education and environmental sustainability, to enhance user options and convenience, and space transformation and flexibility. This Commons area included two cafeterias, a campus bookstore, student lounge spaces, and more.
A new 3-story, 86,000 SF medical office building for the Sharp Rees-Stealy Medical Group. This project supports twenty-one medical clinics including: radiology, laboratory, pharmacy, optometry, family medicine, OB-GYN, pediatrics, physical therapy, and others. The project includes overall development of the 5.6-acre site and includes 420 on-grade parking spaces.