A new 120,561 SF, three-story facility at Golden West College which included lecture spaces, laboratory space, computer labs and support space for the Math, Biology, Life Science and Physical Science departments. There will also be a STEM Center for students
The project is a Design/Build, 7.2 MW cogeneration plant. It includes a Solar Taurus 70 turbine generator, 1 MW diesel "Blackstart" generator, 12 kV paralleling switchgear, heat recovery boiler, cooling towers, various pumps, and required instrumentation.
The project was a three-story, 345,520 SF building that is located on a 37-acre parcel within an existing VA Medical campus. This medical office building is comprised of four distinct “wings”. The project also included 2,000 parking spaces and 5.5-acres of linear park and greenbelt.
The project was a Design/Build apartment building. This project has three levels of subterranean parking, a five-story low-rise element with lease space, and 96 apartment units. The 19-story high-rise element has 217 apartment units.
New construction of multiple buildings, 65,000 SFbus maintenance facility on an existing operationalsite in Chula Vista. This included demolition of 7existing buildings, a new maintenance building,upgrades to an existing maintenance building,a new bus wash building, a new ops & adminthe building, a parking lot for buses and vehicles, siteutility work, UPS and 2 emergency generators.