This project included a 67,924 SF, 3-storyclassroom as well as a 70,000 SF above groundparking garage. Baker provided power, lighting,fire alarm, intrusion control, and area of refuge tothe higher education building.
This project included a 67,924 SF, 3-storyclassroom as well as a 70,000 SF above groundparking garage. Baker provided power, lighting,fire alarm, intrusion control, and area of refuge tothe higher education building.