Project Description

Three photovoltaic systems installed at Steele Canyon High School, Granite Hills High School, and Helix High School. The three systems together will produce nearly 5 million kWh of energy per year. These projects were developed utilizing a combination of carport and ground mounted solar arrays. Each of the solar arrays provides enough electricity to offset 95% of each school’s energy needs on an annual basis.

Photo Copyright © Baker Electric
Project Specs
  • Location San Diego CA
  • System Size
    3.291MW
  • Number of Panels
    7819
  • Annual Energy Cost Savings
    95% of Energy Costs