Three photovoltaic systems installed at Steele Canyon High School, Granite Hills High School, and Helix High School. The three systems together will produce nearly 5 million kWh of energy per year. These projects were developed utilizing a combination of carport and ground mounted solar arrays. Each of the solar arrays provides enough electricity to offset 95% of each school’s energy needs on an annual basis.
- Location San Diego CA
-
System Size
3.291MW
-
Number of Panels
7819
-
Annual Energy Cost Savings
95% of Energy Costs