Skip to main content
Department of Homeland Security Customs and Border Protection Facility Lighting
Project Description

For this $1.2 million energy efficiency project within the Customs and Border Protection Facility, DHS turned to SDG&E and Baker Electric to move forward on an energy savings performance contract for four sites within the region. The project included upgrades to new interior and exterior LED lights and lighting controls. All LED fixtures replaced required T24 testing and commissioning as well.

Project Specs
  • Location San Diego, CA



Grossmont College 12kV Service Replacement
Project Description

Baker Electric installed a new 12kV power supply to the active Grossmont Community College campus. This installation also included a new infrastructure loop providing power conduits and cabling to multiple buildings on campus, as well as 13 manholes with a conduit system. The scope also required regrade and replacement of 1,500 feet of campus roadways.

Project Specs
  • Location El Cajon, CA



Porsche Experience Center
Project Description

The system consists of: Installation of six Owner provided power boxes and two cooling boxes required for the DC charging system. Installation of twelve Owner provided 350 kW DC charging units. Installation of one Owner provided low voltage Switchgear Lineup. Two Owner provided Rectifier Transformers and one Unitized Substation Transformer. Installation of twelve Owner provided 1932 kW and one 9.6 kW AC user units SCE conductor infrastructure and equipment pads.

Project Specs
  • Location Carson, CA



NASSCO 12kV Shorepower
Project Description

This 3,484,800 SF project included the installation of new shore power feed from substation to berth 2, as well as the installation of MV cable, new vaults, transformer, switchgear, substation modifications, programming, splicing, and terminations. Baker Electric had to ensure minimal impact was made to shipyard logistics and production within the active shipyard, which required schedule coordination of multiple departments.

Project Specs
  • Location San Diego, CA



Children's Hospital Orange County
Project Description

This OSHPD 1 project included the installation of conduit, wire and termination for HVAC control system.

Project Specs
  • Location Orange, California