A DDC Controls Upgrade to the existing college.
- Location Irvine, CA
A DDC Controls Upgrade to the existing college.
Building Automation system upgrade in an occupied hospital.
Install 4000-amp unit substation switchboard, 2500/3333KVA transformer and provide 15Kw Elbow Terminators. 4" Conduit Runs
Baker Electric developed, designed, installed, and managed the performance of an energy-efficient retrofit of all exterior lighting. The retrofit included parking lots, two parking structures, roads, and walkways at California State University San Bernardino and Palm Desert Campuses. This project spanned approximately 384,000 SF.
This lighting improvement was for a large hanger complex at San Bernardino International Airport. The project required coordination with the tenant, as Baker worked around planned aircraft maintenance schedules and at elevated heights (75+ feet). The project also included the demolition and removal of existing High Bay fixtures as well as the installation of new High Bay fixtures, new conduit and wiring, and new lighting control panels.