Scripps Hospital LON Control System Replacement
Project Description

Building Automation system upgrade in an occupied hospital.

Project Specs
  • Location San Diego, CA



Cal State University FUllerton
Project Description

Install 4000-amp unit substation switchboard, 2500/3333KVA transformer and provide 15Kw Elbow Terminators. 4" Conduit Runs

Project Specs
  • Location Fullerton



CSU San Bernardino Lighting Retrofit
Project Description

Baker Electric developed, designed, installed, and managed the performance of an energy-efficient retrofit of all exterior lighting. The retrofit included parking lots, two parking structures, roads, and walkways at California State University San Bernardino and Palm Desert Campuses. This project spanned approximately 384,000 SF.

Project Specs
  • Location San Bernardino



Hanger 736 Lighting Improvements
Project Description

This lighting improvement was for a large hanger complex at San Bernardino International Airport. The project required coordination with the tenant, as Baker worked around planned aircraft maintenance schedules and at elevated heights (75+ feet). The project also included the demolition and removal of existing High Bay fixtures as well as the installation of new High Bay fixtures, new conduit and wiring, and new lighting control panels.

Project Specs
  • Location San Bernardino



Department of Homeland Security Customs and Border Protection Facility Lighting
Project Description

For this $1.2 million energy efficiency project within the Customs and Border Protection Facility, DHS turned to SDG&E and Baker Electric to move forward on an energy savings performance contract for four sites within the region. The project included upgrades to new interior and exterior LED lights and lighting controls. All LED fixtures replaced required T24 testing and commissioning as well.

Project Specs
  • Location San Diego, CA