Skip to main content
Del Rey Avocado
Project Description

By installing a custom renewable energy solution from Baker Electric Del Ray Avocado is insuring they meet their financial & sustainability goals.
Their systems will provide an estimated annual electric bill savings of $75K/year and greatly reduce their environmental impact. With a total system size of 204 kW, the Del Ray will offset 150 to 300 tons of carbon dioxide per year – the equivalent of driving 60 cars for a year straight!

Project Specs
  • Location Escondido CA



Watermark Office
Project Description

This project consisted of a 158,000 SF, 6-storyoffice building, a 215,000 SF 4-tier parking structure, and a PV system on the top floor. It also included several EV charging stations and a back-up generator. The class A core and shell included incoming utilities and landscape lighting for the medical office space

Project Specs
  • Location San Diego, CA



Regulus Therapeutics
Project Description

This project was a 46,000 SF bio/pharma tenant improvement. The project included laboratory space, a vivarium, offices, executive offices, conference rooms, a kitchen and break rooms, new electrical distribution, and cold rooms.

Project Specs
  • Location San Diego, CA



Meggitt Manufacturing
Meggitt
Project Description

This 80,000 SF tenant improvement includes manufacturing, office and warehouse space.

Project Specs
  • Location San Diego, California



1 Columbia Place
1 columbia place
Project Description
This project was a 24,000 SF tenant improvement in an occupied office building. Areas renovated included the lobby, mezzanine, and office spaces. Modernization was incorporated to all areas of remodel within the existing building.
Project Specs
  • Location San Diego, California