The project is a Design/Build, 7.2 MW cogeneration plant. It includes a Solar Taurus 70 turbine generator, 1 MW diesel "Blackstart" generator, 12 kV paralleling switchgear, heat recovery boiler, cooling towers, various pumps, and required instrumentation.
This project consists of a complete 49.5 MW Peaker Generating Station, based upon GE LM 6000 "New Generation" natural gas fueled turbine. It includes a 12 kV distribution equipment which was interconnected through a 69 kV switchyard and connected to the local power grid.
The $30,000,000, central plant project was constructed in a 24/7 airport environment. It includes four 1.75 MW natural gas-fired internal generators and a 12kV feed from McArthur Boulevard.
The project is a $45,000,000 central plant facility upgrade. It includes installing nearly 41 miles of new electrical wiring to furnish a 4.167 kW electrical distribution system, two 5 megawatt solar turbine generators, a complete SCADA control system and a continuous emissions monitoring system.