The project is a Design/Build, 7.2 MW cogeneration plant. It includes a Solar Taurus 70 turbine generator, 1 MW diesel "Blackstart" generator, 12 kV paralleling switchgear, heat recovery boiler, cooling towers, various pumps, and required instrumentation.
The project was a three-story, 345,520 SF building that is located on a 37-acre parcel within an existing VA Medical campus. This medical office building is comprised of four distinct “wings”. The project also included 2,000 parking spaces and 5.5-acres of linear park and greenbelt.
The project is a $120,000,000, Design/Build, 220,000 SF Bachelor Enlisted Quarters. It includes a 22,000 SF dining facility, a 540-space parking structure with indoor and outdoor reactional areas. The project was certified LEED Gold.
This project is a new 23,190 SF airfield traffic control tower and base operations facility. The project was certified LEED Silver.
This LEED Platinum Certified project included a 1.5 MW solar energy system for the three 4-story BEQ’s (576 two-person rooms), a landmark projection tower, a 500-seat outdoor amphitheater, and a 706-space 4-story parking garage. This project is a Design-Assist project that contained a high degree of technical and logistical challenges. Baker used BIM and prefabrication to its fullest on this project. The project also had multiple phasing and was adjacent to occupied buildings.