Skip to main content
United States Marine Corps Bachelor Enlisted Quarters
Rendering Courtesy of PGAL, LLC, Las Vegas, Nevada
Project Description

This LEED Platinum Certified project included a 1.5 MW solar energy system for the three 4-story BEQ’s (576 two-person rooms), a landmark projection tower, a 500-seat outdoor amphitheater, and a 706-space 4-story parking garage. This project is a Design-Assist project that contained a high degree of technical and logistical challenges. Baker used BIM and prefabrication to its fullest on this project. The project also had multiple phasing and was adjacent to occupied buildings.

Project Specs
  • Location Twentynine Palms, California