The project was an OSHPD-1, 71,000 SF build-out of levels 2, 3, 4, and 5 of the East Tower building of Sharp Grossmont Hospital. Installation of conduit, wire, and termination for HVAC control system. TI including new lighting and control, devices, and gear. Conduit and box only for all LV systems.