Electric Vehicle Charging

Electric Vehicle ChargingSince 2010, Baker Electric has been installing Commercial and Residential EVSE (Electric Vehicle Supply Equipment) units – more commonly known as “chargers”.

We understand the permitting and installation requirements and are the customer-centered partner that can efficiently and professionally install the electrical connection you need for all your EV charging. We have installed over 750 electric vehicle charging stations throughout Southern California in the last 30 months.  If you need 1 or 100+ stations, Baker Electric is your solutions provider. Contact us today.

Our EV Timeline

  • December 2010 – Baker Electric installs first residential EVSE for first all-electric Nissan LEAF delivered to a San Diego customer, and only the second LEAF delivered to a customer in the entire United States
  • June 2011 – Baker Electric installs the first commercial public charging stations at Balboa Park’s Ruben H Fleet Science Center parking area
  • November 2012 – Baker works with Car2Go, an urban car-sharing program, to install (34) chargers in San Diego’s first car charging barn, located on 9th Ave. downtown
  • January 2013 – Baker Electric installs the first DC Fast Charge unit (able to fully charge a car in minutes vs. hours) in addition to the 20 Level 2 units already installed at San Diego State University
  • April 2013 – Baker Electric celebrates installing its 500th residential unit and has now installed over 250 commercial units throughout Southern California

Partial list of commercial EVSE customers:

  • ACE Parking (Corporate Headquarters and 4th Ave. Downtown)
  • Aladdin Parking Structure – Ketner Dr. by the Airport
  • Balboa Park – Ruben H. Fleet Science Center and Municipal Gym (near Air and Space Museum)
  • Bloomingdale’s – Fashion Valley Mall
  • Borrego Springs Chamber of Commerce
  • California Center for Sustainable Energy
  • Car2GO @ 633/632 9th Ave.
  • Car2Go Charging Depot @630 10th Ave.
  • Cathedral Catholic High School
  • Claire’s on Cedros
  • Cushman & Wakefield – Lusk Blvd. Office Building
  • Cushman & Wakefield – Torreyana Office Building
  • IKEA (Costa Mesa)
  • IKEA (San Diego)
  • Intuit
  • Kilroy Properties – Evening Creek Rd. Office Building
  • Kilroy Properties Valley Centre Dr.
  • Kohl’s (Chula Vista and Santee)

  • Kyocera
  • Life Technologies
  • Macy’s (Chula Vista – 2 locations, North County Fair, El Cajon, Camino Del Rio)
  • Marvin K. Brown
  • Mission Bay Park East – De Anza Cove Parking Area
  • Mitchell International
  • Northrup Grumman Spectrum Center Campus
  • Pioneer’s Hospital, Brawley, CA
  • Qualcomm (Morehouse Campus, Bldg, Q, AQ, WT)
  • Regency Centers – 4S Ranch Shopping Center
  • Regency Centers – Costa Verde Office Building
  • Regency Centers – Friars/Mission Rd. Shopping Center
  • San Diego Botanic Gardens
  • San Diego Community College
    (City College, Mesa College, Miramar College, ECC @ Aero
  • Dr., ECC @ Ocean View Dr.)

  • San Diego Gas & Electric locations in Carlsbad, Overland Dr., Century Park and Metro downtown
  • San Diego State University (SDSU) Parking Structures 4, 5, 6, 8, Lot G, and the Children’s Center – All Level 2 and (1) DCFC at Lot G
  • Sharp Mary Birch Hospital
  • Sheraton Hotel Carlsbad Coastal
  • SKLZ
  • Solana Beach City Hall
  • Sony Online Entertainment
  • Sun Harbor
  • The Lodge at Torrey Pines – Parking Garage
  • University of San Diego (USD) – Alcala Vistas Student Housing, Mission Main Parking Structure
  • Wal-Mart (National City)
  • Wal-Mart (Vista)
  • Whole Foods Hillcrest location