Avocado Grove

CaseStudyPhotoAvocado

Location: Escondido, CA

System Size: 135 kW

Image Gallery

Baker Commercial Solar performed as the prime contractor to provide this 135 kW solar system to an avocado grove in Escondido, CA. The ground mount system was installed and interconnected at their “well” location and uses the SDG&E Net Energy Metering (NEM) Aggregation to distribute energy to other meters on the property. With the high cost of water and land in San Diego solar is a successful energy saving solution for agriculture irrigation pumps. The solar system installation provides this local farm with savings through tax rebates and utility rate cuts.